Project Snapshot
Corridor Solutions delivered a practical concept design for Lake Terrace in Taupō, aiming to update the road with minimal capital investment alongside existing asphalt renewal cycles.
What We Did
Developed low-cost design ideas in just one week—presented to the TDC General Manager and Council.
Recommendations included surface layout modifications to improve safety and flow while blending into scheduled roadworks.
Outcome (even though not implemented)
Ideas were well-received, with Council agreeing to trial them before resurfacing.
Proved our ability to deliver fast, cost-effective solutions under tight deadlines.